Sorry, but I cannot give a number on RX <---> TX switching time. We have only measured power down to Active (TX or RX). Thus, assuming Active to power down is 1 us the RX ---> TX switching time will be 1 us + 1 us = 2 us and TX ---> RX switching time = 1 us + 12 us = 13 us.
↧